In 1993 the facility grid connections during the Berlin-Brandenburg cash region ended up renewed. In a lot of the interior districts of Berlin power strains are underground cables; just a 380 kV plus a one hundred ten kV line, which operate from Reuter substation to the city Autobahn, use overhead https://vernon98753.atualblog.com/32615735/an-unbiased-view-of-services