For any safe installation, use specialised metal roofing screws that match the colour of your ridge cap. These needs to be placed about 12 to 16 inches apart alongside both sides from the ridge. As you put in subsequent panels, overlap them in accordance with the maker’s tips. Appropriate overlapping https://residential-rubber-roof-i80123.wizzardsblog.com/35401179/how-residential-flat-roof-installation-can-save-you-time-stress-and-money